Project 1

                       

Site Type:     

Stadium

 

Coverage Requirement:  

Customer Public Sports Stadium with 45,000 seat capacity and concert venue, comprising of Main Pitch, 4 stands, seating areas, 4 level South stand indoor/Back Of House area including 15,000 Sqm premium and conference facility                     

​

Customer Challenge 

Requirement for full multi-operator, multi-technology capable system Support for 3G / 4G / 5G technology layers Frequency bands ranging from 800 MHz to 3600 MHz14-sector design to meet capacity demandsSolution to comprise a full MIMO system

​

​

Surecom Approach

 Design, installation, commissioning, and full handover of a multi-operator capable stadium solutionDeployment of 1800, 2100, and 2600 MHz bands for 3G and 4G technology layersSystem upgradeable/expandable to support additional low and high band layers from 600 MHz to 3600 MHzInfrastructure deployed over multiple distributed common areas Provision for existing and future fibre and power requirements 

​

Solution

  • 14 sectors providing full coverage and capacity solution ​

  • 14 x Macro Antenna for stands7 seating areas​

  • 50 x Indoor MIMO antenna​

  • System to cater for an allow forup to 3 x Network operators

​

​​​​​

Project 2

 

Site Type:     

Windfarm Ireland PoC

 

Coverage Requirement:     

A multinational energy company headquartered in the UK who runs and maintainsa windfarm in the Donegal area of Ireland. The windfarm produces power theequivalent of approximately 45,000 households which is generated by 38 windturbines.​                   

​

Customer Challenge​

In an area that has no public network coverage, the maintenance teams needed away to securely connect to key maintenance applications and be able contactcolleagues for remote support. The customer was also interested in trialing digitalinnovations like smart glasses and drones.​

​

Surecom approach​

Surecom was engaged via one of the Irish mobile operators to plan and design theoutdoor radio (RAN) solution to provide the required coverage. After a structuralintegrity test provided by Surecom highlighted the initial location was unsuitablethe engineering team design a solution that allowed radio equipment to bemounted directly to some of the wind turbines.​

​

Customer Outcome​

This successful PoC lead to further discussions to replicate the solution across alarge number of Irish windfarms

​

​

​

Project 3

​

Customer​

A US Global blue chip company with facilities in Ireland​

​

Customer Challenge​

Requirement for a full multi-operator, multi-technology DAS in-building solution​

  • Building details:​

  • Multi-level, 4-storey building​

  • Additional 2 car park levels and basement​

  • Open-plan layout with glass and wood partitions​

  • Design constraints:​

  • High-spec building finish​

  • Cabling needed to be aesthetically integrated​

  • Capacity requirements:​

  • Must cater for 3,000+ staff and visitors​

​

Surecom approach​

  • Design, installation, commissioning, and full handover of an in-buildingrepeater solution​

  • System provides full coverage for all mobile services up to 2100 MHz​

  • Hybrid active–passive solution for performance and efficiency​

  • Approved by all mobile operators for compliance and interoperability

​​​​

Solution

​

  • Hybrid solution​

  • Multi Operator Multitechnology das system​

  • Connected to 3 X operatorbase stations. 

​

​

Surecom White Logo.png

Head Office:

Unit 43, Block 528 off Grants Road, Greenogue Business Park, Rathcoole, Co. Dublin, D24 DVX7 Ireland

​


Company Registration Address:

Bothar Beri, Kilcoran, Cahir, Co. Tipperary

​

Surecom Network Solutions Ltd. Company Registration Number: 398751

​

Surecom Privacy Statement: Privacy-statement

Surecom Gender Pay Report: Gender-Report

bottom of page